Highway Transportation

The West Central Ohio Industrial Center (WCOIC) has direct, non-stop access to Interstate 75 in less than two miles at Exit 110 and an alternate route via Exit 104, less than seven miles south of the site.  It has interstate visibility on its east perimeter.

The WCOIC is midway between Interstate 70 near Dayton, Ohio and Interstate 80/90 near Toledo.  US 33, a major commercial route between Chicago and Washington, DC, runs along the site’s northern boundary.  US 30, another major east-west business route, is just 25 miles north of the site via an I-75 interchange.

This excellent highway access provides your company with the ability to reach profitable markets and important suppliers quickly and affordably.

To view/download the site’s Truck Route Map, click here »
To view/download a regional transportation map, click here »

Being Beyond Shovel Ready Saves Your Company Time & Money!

The phrase “Shovel Ready” is a widely
used term in economic development
circles. While it might have many different
definitions, here’s what makes
our location Beyond Shovel Ready:

          

Available Acres

Price per Acre

Highway Access

Rail Access

Workforce

Utilities

Zoning

Telecom

Electric

Natural Gas

Water

Incentives

Sanitary Sewer

Up to 471 Acres

$15,000

I-75 @ US 33

CSX

350,000 within 50 mi.

All on Site

Industrial

Fiber on Site

69KV Substation on Site

4" Lines on Site

10" - 15" Lines on Site

Max. Incentives Avail.

10" & 12" Lines on Site

Logos